Your Phoenix area home deserves an upgrade. And if you’re ready to move forward, one of the first questions you’ll need answered is: How long does a home remodel take? Understanding the timeline is essential, especially in Scottsdale and Paradise Valley, where high-end materials, custom design, and community regulations all influence the pace of a project.
In this guide, we look at what impacts remodeling timelines, the average remodel time per room, common project delays, and our proven design-build process.
On this page:
Understanding your remodeling timeline starts with understanding what impacts it. Here in the Scottsdale and Paradise Valley market, several factors play a major role.
The biggest driver of the timeline is the complexity of your remodel:
Luxury remodels often include:
Lead times for high-end materials can significantly influence the overall home renovation timeline, and many homeowners find it easier to plan once they have a general sense of how much a remodel costs.
Neighborhoods across Scottsdale, Paradise Valley, and Cave Creek frequently have:
Securing approvals can add weeks or even months, depending on the community.
Your design phase moves as quickly as your selections do. The journey from Discovery Call → In-Home Measurement → Showroom Design Presentation → Design Retainer typically spans 3 to 8 weeks. Homeowners who approve layouts, materials, and budgets promptly can shorten the pre-construction phase.
Once walls open, remodelers may uncover:
These require correction and can affect the schedule.
High-end appliances, custom glass, steel, or stone are frequently backordered. Additionally, the Phoenix metro area has a strong demand for skilled trades. The more complex the project, the more coordination is required.
Everything from structural changes and custom cabinetry to decision-making speed and material availability plays a role in shaping your overall home renovation timeline.
That’s why partnering with an experienced design-build firm is essential. Kitchens by Good Guys makes sure your project stays on track if you're updating a single room or completing a full-house remodeling project. We guide you through every step with a white-glove experience that minimizes delays, anticipates challenges, and brings clarity to the entire journey.
A whole home remodel is the most transformative type of project, and also the most variable when it comes to timeline. Most high-end home remodels in the metro Phoenix area take 6 to 12+ months after design is finalized.
Here are the things with the biggest impact for full-house remodeling:
Whole-home remodels typically include:
These spaces involve multiple trades working in sequence, which naturally lengthens the home renovation process timeline.
Opening up walls, moving plumbing, adding an island to the kitchen, or reconfiguring a primary suite introduces additional permitting, inspections, engineering, and construction time.
A full gut renovation is the most time-intensive type of remodel. In the Phoenix Valley, a true full-gut transformation typically takes 8 to 14+ months after the design phase is complete.
Compared to a standard whole-home remodel, full gut renovations require:
Because every system is touched, each trade must work in a carefully coordinated sequence. This adds time but results in a smoother, more future-friendly home.
When homeowners ask, “How long does it take to renovate a house?”, the answer always depends on scope, structure, and the level of customization involved. Whole-home remodels and full gut renovations naturally require more time, coordination, and craftsmanship than single-room projects.
Kitchens by Good Guys does complete home transformations. Our white-glove design-build process, meticulous scheduling, and expertise across every room of the home mean your remodel progresses smoothly, no matter how extensive the vision. Find inspiration, and see what'd possible in our portfolio.
In Scottsdale and Paradise Valley, a typical kitchen remodel timeline ranges from 10 to 16+ weeks after design approval. The exact schedule depends on customization, appliance lead times, and whether structural changes are involved.
Here are some factors that specifically impact the kitchen remodeling timeline:
Luxury kitchens usually feature:
These premium elements can add 6 to 12 weeks to the ordering phase.
Open-concept designs are in high demand across the Valley. Removing walls, relocating plumbing, or upgrading electrical systems adds engineering, permitting, and inspection steps.
High-end appliances may have extended lead times depending on brand and supply chain cycles.
Designer backsplashes, waterfall countertop edges, and custom lighting packages contribute to both time and craftsmanship requirements.
Because kitchen remodel timelines can shift based on cabinetry, materials, structural updates, and appliance availability, you need a team that understands how to navigate every detail with confidence. That’s where Kitchens by Good Guys stands apart. Our depth of expertise in high-end kitchen design and construction means we anticipate challenges before they arise, coordinate every trade with precision, and make sure your remodel is completed the right way.
Most bathroom remodels take 4 to 10+ weeks after design is complete. The exact duration depends on tile complexity, plumbing updates, and whether you’re reconfiguring the layout.
Here are the common things that impact a bathroom remodel timeline:
Luxury bathrooms typically feature:
Tile and glass fabrication alone can add several weeks.
Moving a shower, tub, or vanity can extend your timeline due to rough-in work, inspections, and specialty materials.
Features can add layers of coordination and craftsmanship, such as:
Because bathroom remodels often involve custom tilework, plumbing adjustments, specialty glass, and premium finishes, timelines can vary more than homeowners expect. With Kitchens by Good Guys, you have a team that understands every nuance of luxury bathroom remodeling and knows exactly how to orchestrate the process for a smooth, stress-free experience.
Even the most well-organized remodel can encounter delays. Kitchens by Good Guys anticipates, plans for, and minimizes these delays through our structured, white-glove process.
Here are some common delays to the home remodel timeline in Phoenix:
Adding features or altering design decisions midstream may require new materials, permits, or sequencing adjustments.
Older plumbing, outdated electrical systems, slab modifications, or hidden water damage can add necessary but unplanned work.
High-demand appliances and specialty fixtures sometimes shift availability without warning.
Despite these possibilities, Kitchens by Good Guys uses meticulous planning, BuilderTrend communication, and a proactive design phase to keep your home renovation process timeline on track.
The answer depends on the scope of your project and your comfort level. Here’s what to expect:
A full-house remodeling project typically affects multiple rooms, utilities, and pathways throughout the home. Noise, dust, and safety restrictions make living on-site challenging and inconvenient.
You can stay during a kitchen remodel, but you’ll be without:
Some clients create temporary kitchenette setups, but most find it easier to relocate for at least part of the project.
If you have additional bathrooms available, living on-site is usually manageable. For primary suite renovations, many clients temporarily shift into a guest suite.
Kitchens by Good Guys is known for exceptional jobsite cleanliness and daily cleanup, which is an important concern among luxury homeowners.
Even so, living through construction can still be disruptive. When in doubt, we’ll walk you through the pros and cons during the planning phase so you can make the most comfortable decision.
One of the biggest advantages of working with Kitchens by Good Guys is our structured, seamless design-build process. It’s carefully refined to not only create beautiful spaces, but to deliver a predictable, stress-free home renovation timeline from start to finish.
Here’s how we accomplish clarity, communication, and efficiency:
It all starts with a personalized Discovery Call where you’ll share your goals, style preferences, and ideal investment range. Our designers help you refine your vision and understand what’s possible in your home.
Next, we visit your home to take precise measurements, assess the layout, and review your design priorities. This step eliminates surprises later and makes sure your proposal reflects your real space.
You’ll meet with our team at our Scottsdale showroom for a fully immersive design experience. Expect:
By the end of this phase, your selections, plans, and specifications are finalized.
Once materials are ordered and lead times are confirmed, your project is scheduled and executed by our skilled craftsmen. A dedicated project manager oversees every detail and communicates key milestones through the BuilderTrend portal, giving you full visibility at all times.
Once construction is complete, we guide you through a detailed final walkthrough to check that every finish, fixture, and design detail meets our standards and exceeds yours. This is where we fine-tune anything needed, answer final questions, and make sure your new space feels exactly the way you envisioned.
This process is the backbone of every successful project. These structured phases of a home remodel keep timelines organized, minimize delays, and mean you’ll get the white-glove experience that Kitchens by Good Guys guarantees.
With so many moving parts, it’s clear that no two remodels unfold the same way. That’s why homeowners looking for home remodeling in Paradise Valley, Scottsdale, and the whole greater Phoenix area trust Kitchens by Good Guys.
Our white-glove design-build approach brings clarity to every step of the journey, minimizes delays before they happen, and makes sure your remodel is managed with precision, communication, and unmatched craftsmanship.